For lightweight structures
Cabins, decks, gazebos and lightweight timber or bamboo structures.
- Typical helix
- Ø240 mm
- Shaft wall options
- ≈ 3 / 5–5.5 mm
ARCSTONEFor partnersInternational engineering. Made in Bali. Screw pile foundation systems built for the realities of Indonesia.
Build your foundationExplore our projectsA continuous load path, from the building to the ground. Every component works together.
Cabins, decks, gazebos and lightweight timber or bamboo structures.
Villas, houses, restaurants and permanent modular buildings.
Pools, heavier buildings and projects requiring additional capacity.
Diameter alone does not define load capacity. The complete foundation is engineered for your project.
STEEL / PROTECTION / LONGEVITYSPINDO galvanized steel pipe, approximately 3.0–3.2 mm wall. Fabricated helices, welds and exposed areas receive their specified protective coating.
Approximately 5–5.5 mm wall. Fabricated first, then hot-dip galvanized in Surabaya, with a target zinc thickness of approximately 90 µm, verified against the coating records.

Driven steel pipes for suitable sandy ground, with a purpose-designed central connection.

Connections for bamboo, timber, steel and designed concrete floor systems. Rock sites can be assessed for a separate expanding-anchor solution.
Start with the size of your project. See the system take shape in seconds.
Pile lengths are for visualization only. Bearing depth must be established from soil and load data. Transparent terrain reveals the buried piles.
This visualization is generated for preliminary planning purposes only. Final pile spacing, pile diameter, pile length, helix configuration, steel grillage and reinforcement must be confirmed by Arcstone engineers based on the architectural design, structural loads, site topography and soil conditions.
From tropical hillsides to open fields. Built by our team, for the conditions on site.

Elevated timber construction

Double-channel foundation grid

Multiple foundation platforms

Screw piles on sloping terrain
Pile heads and fabricated steel components, delivered and ready for the installation sequence.
ARCSTONE brings more than 15 years of international team experience to Indonesian construction. Our factory in North Bali makes complete screw pile systems, adapted to local ground, tropical weather and challenging access.
From analysis and fabrication to installation and final alignment, one team takes responsibility for the connected system. Bali is our starting point. Indonesia is our horizon.
NORTH BALI / OUR WORKSHOPAlexander Mitchell develops screw-pile foundations for difficult ground and marine structures.
Historical researchFrom lighthouses and bridges to buildings, anchoring systems and slope applications across international markets.
Experience in demanding climates, from freezing winters and seasonal temperature swings to hot, humid sites.
Made in Bali. Engineered for Indonesian sites. Local fabrication with a nationwide vision.
Soil, loads, topography and access define the foundation concept.
Produce the piles, heads, channels and braces. Inspect the steelwork and coating.
Set out the grid, install the piles and verify the project acceptance criteria.
Align the heads, assemble the grillage and complete the final inspection.

On-site vertical compression testing with equipment rated up to 50 tonnes. The test programme, reaction system and target load are engineered for each site. This is a testing capability, not a universal pile load rating.
Receive recorded load–settlement data, photos and engineering recommendations.

Explore the range, materials and system details. Project-specific material certificates and inspection records form part of the agreed documentation scope.
Tell us what you want to build and where. Our team will help define the next step.
WhatsApp / +62 812 37 00 56 21 Instagram / @arcstone.group