ARCSTONE / INSTALLATION ACADEMY
For partners
ARCSTONE / NORTH BALI

One team. One standard.

Arcstone is launching a seven-day intensive programme: one quality standard from reading a project to foundation handover. No screw-pile experience is required. Technical aptitude, discipline and willingness to learn matter. Construction companies can train their own specialists.

Become a certified Arcstone installer ↗

7 programme days · 6 original modules · theory + supervised practice

Meet Arcstone

Meet Arcstone: PT Architecture Stone Group manufactures foundations near Lovina, North Bali. The engineer defines the design; the installer reads the pile schedule, drawings and acceptance criteria. Follow the load path from building to grillage, head, shaft, helix and soil. Never select capacity by diameter alone.

Find our North Bali location ↗

Your path in the team

Graduates work in a standard three-person crew led by a Team Leader. Development path: trainee → installer → Team Leader → trainer. Work opportunities depend on practical assessment, team readiness and available projects; neither work nor certification is automatic.

Start your training

Loading progress…

DAY 1 / 07

Technology and first test

Meet Arcstone: PT Architecture Stone Group manufactures foundations near Lovina, North Bali. The engineer defines the design; the installer reads the pile schedule, drawings and acceptance criteria. Follow the load path from building to grillage, head, shaft, helix and soil. Never select capacity by diameter alone.

The pile and how it works

What is a screw pile?

A steel shaft with a helical plate is screwed into the ground. The pile transfers loads to soil. Capacity depends on its configuration, ground conditions and installation quality.

No concrete curing period

The steel pile does not need concrete to cure. Loads may be applied after installation and connections are checked in accordance with the design. Weather and site conditions can restrict work.

Three pile components

Shaft: Ø76, Ø89 or Ø114 mm. Helix: the helical plate near the tip. Head: the connection to the grillage. The design specifies the configuration; installers do not select it on site.

Installation resistance

A change in resistance may indicate different soil or an obstruction. An operator’s impression does not establish capacity. The engineer specifies measurements and acceptance criteria.

A connected system

The grillage connects piles and distributes loads according to the design. Arcstone’s standard concept uses paired channels. There is always a pile head between the shaft and the grillage.

Day assignment

Explain the system and identify which decisions must be referred to the engineer. Complete the first test below.

Daily knowledge check

Answer all questions. The result and answers are recorded in your training inquiry.

Register to take the test
Open the six-module visual reference ↗